BTU Conducting Aerial Inspection of Transmission System

on July 27, 2017 in Press Releases

Bryan Texas Utilities (BTU) will be conducting an aerial inspection of various elements of the BTU power system on Friday, August 4th, and Saturday, August 5th.  The contractor hired to complete this annual inspection will be using a helicopter to inspect parts of the BTU transmission system.

This work is part of an overall preventative maintenance program and ongoing effort to enhance BTU’s electric system reliability. Residents of Brazos and Burleson County may notice this low-flying aircraft.

Subscribe

If you enjoyed this article, subscribe now to receive more just like it.

Top