Skip to main content

Bryan Texas Utilities

BTU logo

X

Suggested content for you



facebook icon twitter icon
July 27, 2017

BTU Conducting Aerial Inspection of Transmission System

Bryan Texas Utilities (BTU) will be conducting an aerial inspection of various elements of the BTU power system on Friday, August 4th, and Saturday, August 5th.  The contractor hired to complete this annual inspection will be using a helicopter to inspect parts of the BTU transmission system.

This work is part of an overall preventative maintenance program and ongoing effort to enhance BTU’s electric system reliability. Residents of Brazos and Burleson County may notice this low-flying aircraft.

Posted in: Press Releases